Our building project has a PV system installed on the roof, but the building owner is leased by the building owner through a 10 year Power Purchase Agreement. The price is set to increase at 1.5% each year. When evaluating the cost of the energy, should we use the price during the first year, or average the price over the 10 years?

Answer:

Log in or register to post comments

Connect.

Find LEED consultants and professionals with green building skills and experience.

Meet Pros.

Avatar
LEED Consultant
Colombo
Avatar
Vice President Operations
Washington, DC
Avatar
Administrative Assistant
singapore

Learn.

Relevant education and training to consider.

Why join Poplar Network?

Poplar is an online network connecting green building professionals with industry-specific education and training.

  • Learn about green building
  • Save on LEED exam prep
  • FREE continuing education
  • Join the conversation
  • Connect with peers

- Join Today, it's FREE!