You got 12 of 25 possible points.
Your score was: 48 %
Result:
Fail

Question Results

Score 1 of 1

Question:

Which of the following is not part of the prerequisite for Storage & Collection of Recyclables?

Response:

paper

glass

plastics

metals

organic waste

corrugated cardboard

Score 0 of 1

Question:

A project is at two major intersections in the urban environment. What is maximum light allowed at edge of curb as it relates to SSc8?

Response:

Zero horizontal and vertical foot candles

0.20 horizontal and vertical footcandles

0.40 horizontal and vertical footcandles

0.60 horizontal and vertical footcandles

0.80 horizontal and vertical footcandles

Score 0 of 1

Question:

Credit EQc5 – Indoor Chemical & Pollutant Control requires that you exhaust each space with at least ____ and create negative pressure.

Response:

0.30 cu ft per minute

0.50 cu ft per minute

0.70 cu ft per minute

1.20 cu ft per minute

1.60 cu ft per minute

Score 0 of 1

Question:

Which of the following is not included in the Basic Services list for Community Connectivity?

Response:

Beauty

Day care

Convenience grocery

Place of worship

Bookstore

Theatre

Score 1 of 1

Question:

EQc8.2 requires direct line of sight for this percentage of regularly occupied space?

Response:

50%

60%

70%

80%

90%

Score 0 of 1

Question:

The maximum distance that a project should be located is ___ for __ public or campus bus line(s).

Response:

¼ mile , 1

¼ mile , 2

¼ mile , 3

½ mile , 1

½ mile , 2

½ mile , 3

Score 1 of 1

Question:

Regional materials must come within ___ miles of the project.

Response:

25

100

250

500

1,000

Score 1 of 1

Question:

Waste diversion calculations can be based upon (Choose 2)

Response:

density

cost

surface area

weight

volume

length

Score 0 of 1

Question:

Low Emitting & Fuel Efficient Vehicles, Option 2, requires the installation of alternative-fuel refueling stations for ___ of the project’s total parking capacity.

Response:

1%

2%

3%

4%

5%

Score 0 of 1

Question:

A new building will have 412 employees working in it. Local code requires at least 1 parking space for every 2 employees, but allows no more than 550 parking spaces on-site in total. What is minimum number of carpool spaces that must be provided in order to earn Alternative Transportation, Parking Capacity?

Response:

8

9

10

11

12

Score 0 of 1

Question:

Which of the following represents a possible compliance path for Alternative Transportation, Parking Capacity? (Choose 3)

Response:

Size parking not to exceed minimum local zoning requirements and provide preferred parking for carpools equal to 5% of the total parking capacity

Provide preferred parking for Low Emitting Vehicles for 5% of total parking capacity

Size parking not to exceed minimum local zoning requirements and provide at least a 20% discount to all building occupants

Provide no new parking

Demonstrate at least a 20% reduction in personal automobile usage through providing preferred parking for carpools

Score 1 of 1

Question:

Operable windows can be used in lieu of comfort controls for areas that are __ inside and __ to either side of the operable part of the window.

Response:

30 ft, 15ft

20 ft, 10 ft

10 ft, 5 ft

15ft, 30ft

10 ft, 20 ft

5ft, 10ft

Score 0 of 1

Question:

The following formula is used for EQc8.1 – Daylight: (0.150 < VLT x WFR < 0.180); What does VLT stand for?

Response:

Visual Lucent Transmission

Variable Light Transmittal

Visible Light Transmittance

Variable Length Transmission

Varied Light Transmission

Score 0 of 1

Question:

In the prerequisite Construction Activity Pollution Prevention in Sustainable Sites, the Erosion and Sedimentation Control (ESC) Plan must conform with the

Response:

1977 Clean Water Act

2001 National Pollutant Discharge Elimination System program

2003 EPA Construction General Permit

2004 National Pollutant Discharge Elimination System program

2010 EPA Construction General Permit

Score 1 of 1

Question:

The civil engineer on a project determines that the average annual rainfall on a given site is 23 inches. How much of the rainfall, in inches, must be captured and treated in order to comply with Stormwater Design, Quality Control?

Response:

17.3

18.4

20.7

21.9

23

Score 1 of 1

Question:

Recycled content is equal to

Response:

Post-consumer + ½ Pre-consumer

½ Post-consumer + ½ Pre-consumer

    ½ Post-consumer + Pre-consumer

    Post-consumer + Pre-consumer

    2 x Post-consumer + Pre-consumer

    Score 1 of 1

    Question:

    The project has decided to use waterless urinals and composting toilets and baseline design indicates that urinals and standard toilets accounted for 340 gallons per day. Since the total potable water use in the building is 1000 gallons per day how many points are earned from only the WEc3 credit?

    Response:

    1

    2

    3

    4

    Score 0 of 1

    Question:

    Regarding secure bicycle racks and/or storage in commercial buildings, the requirement is to provide ___ for building users in the building.

    Response:

    3%

    5%

    10%

    12%

    15%

    Score 1 of 1

    Question:

    Material reuse credits are based on

    Response:

    density

    cost

    surface area

    weight

    volume

    length

    Score 0 of 1

    Question:

    Which of the following credits would most likely be affected by a vegetated roof? (Choose 3)

    Response:

    Heat Island Reduction, Non-roof

    Stormwater Quantity Control

    Stormwater Quality Control

    Measurement & Verification

    Optimize Energy Performance

    Score 1 of 1

    Question:

    In regards to MRc1.1, if the project includes an addition of this size this credit is not applicable.

    Response:

    1.15x the square footage of the existing building

    1.5x the square footage of the existing building

    2x the square footage of the existing building

    3x the square footage of the existing building

    4x the square footage of the existing building

    Score 1 of 1

    Question:

    How many basic services can be anticipated?

    Response:

    0

    2

    4

    6

    8

    Score 1 of 1

    Question:

    In order to achieve exemplary performance for SSc2 you must consider an area twice as large with an average density

    Response:

    8,000 square feet/acre

    10,000 square feet/acre

    12,000 square feet/acre

    80,000 square feet/acre

    100,000 square feet/acre

    120,000 square feet/acre

    Score 0 of 1

    Question:

    The following materials cannot qualify for EQc4.4 – Low-Emitting Materials (Choose 3)

    Response:

    Fit-out

    Furniture

    Weatherproofing

    Interior wall

      Equipment

      Desks

      Score 0 of 1

      Question:

      A developer is breaking ground on a mixed use building that will include residential apartment units atop commercial store fronts including two banks, a drycleaners and a restaurant. How many other amenities must be within a ½ mile of the project in order to comply with Community Connectivity?

      Response:

      6

      7

      8

      9